Please verify whether a primary device is present among the devices connected to the power station. When devices are added to the power station, they are automatically set as master and secondary devices. Usually, the first device added is the master, and the subsequent devices are slaves (as shown in the figure on the right). Only when there is a primary device in the power station can you add an electricity meter.


